Salt la conținut
Global sound
Beyond Oil: The Rise of Critical Metals

Beyond Oil: The Rise of Critical Metals

Impossible Metals Eureka III Plume Modeling Study

· 1 h 0 min · Sezonul 1 Episodul 3

Note de episod

To fulfill the requirements for testing Eureka III within the BGR contract area in the Clarion Clipperton Zone, a plume modeling study is submitted to the International Seabed Authority as part of the Environmental Impact Statement.
Tom Foster outlines the key assumptions and methodologies behind the sediment disturbance modeling for the proposed Eureka III test and presents the results of this analysis.

This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit impossiblemetals.substack.com

Site: impossiblemetals.substack.com

Live, ultima oră: 6.605 melodii pe 2.411 posturi din 111 țări

Descoperă lumea prin radio

Mai multe moduri de a descoperi (7)

Ai auzit ceva frumos? Salvează-l sau deschide-l direct în Spotify.

★ Artist of the week The fastest riser on the radio this week
Your song here? From € 9 per week →
Classic FM at the MoviesContinuă să asculți