Siirry sisältöön
Global sound
Oil and Gas Upstream

Oil and Gas Upstream

Reducing Offshore Decommissioning Planning Time by 80% with Martyn Fear, Promethean Energy | Ep 361

· 35 min

Jakson kuvaus

In this episode, Martyn Fear, COO of Promethean Energy, talks with Host, Elena Melchert, about the complex world of offshore well decommissioning, the challenges faced, and innovative solutions to optimize costs and safety in the industry. LINKShttps://info.promethean-energy.com/upstreampodcast Brought to you on OGGN, the largest and most listened-to podcast network for the oil and energy industry. Sign […]

Sivusto: feeds.oggn.com

Livenä, viimeisin tunti: 7 239 kappaletta 3 288 asemalla 126 maassa

Löydä maailma radion kautta

Lisää tapoja löytää (7)

Kuulitko jotain hyvää? Tallenna se tai avaa se suoraan Spotifyssa.

★ Artist of the week The fastest riser on the radio this week
Your song here? From € 9 per week →
Radio WZBZ 99.3 The BuzzJatka kuuntelua