Zum Inhalt springen
Global sound
Spaces Podcast

Spaces Podcast

230. Understanding Change Orders

· 14 Min. · Staffel 8 Folge 230

Shownotes

In this episode of SPACES, Dimitrius breaks down why change orders occur, including owner decisions, unforeseen conditions, code requirements, unavailable materials, and missing or misunderstood project information.
He also addresses the growing debate over whether owners should start with an architect, designer, or contractor to better control construction and costs. The reality: no one can accurately price a project that has not yet been defined. Whether you use an architect-led, contractor-led, or design-build process, someone still has to develop the design and specifications before…

Website: wordpress-405417-3487814.cloudwaysapps.com

Live, letzte Stunde: 11.647 Songs auf 5.633 Sendern in 128 Ländern

Entdecke die Welt über das Radio

Mehr zum Entdecken (7)

Etwas Schönes gehört? Speicher es oder öffne es direkt in Spotify.

★ Künstler der Woche Der schnellste Aufsteiger im Radio diese Woche
Dein Song hier? Ab € 9 pro Woche →
Radio 538 luisteren - Live!Gerade beliebt