Notas del episodio
Summary Solar, battery storage and EV charging used to be planned as three separate projects, each with its own business case. That is changing quickly. Rising energy prices and slow grid connections are pushing charge point operators across Europe to design PV, BESS and chargers together as one integrated system. For CPOs planning high-power sites, the question is shifting from how many chargers to buy towards how to design the whole site around the grid, the energy and the vehicles to come....

