Shownotes
On 19 March 2025, METR reported that the length of software tasks agents can complete had been rising exponentially for about six years, with a doubling time of around seven months. That rise is a real measurement, and a longer time horizon still does not by itself do the job. The episode separates that chart from how often a particular job comes out right, names four gaps a better model does not close, and sets the capability line beside Paul David's 1990 account of factories and the dynamo. Of any capability chart, the questions are at what reliability, and over what length of task.

