Catatan episode
Who owns the float on a construction schedule? It's not intuition or "how we did it last time." It's whatever the contract says, and depending on the spec you're under, that answer can flip entirely.
In this episode, Stelic EVP Michael Bograd sits down with Stelic EVP Brook Bolger to break down total float: how Caltrans lets whoever generates float keep it, why most contracts (including the Army Corps of Engineers UFGS spec) treat float as a shared commodity instead, what subcontractors need to watch for in "keep pace with the schedule" clauses, and why consuming your own float still isn't…

