Skip to content
Global sound
Bench Boost by Inorganic Ventures

Bench Boost by Inorganic Ventures

CCVs & ICVs

· 9 min

Show notes

Send us Fan Mail This week on Bench Boost Mike explains two key ICP-OES/ICP-MS quality control samples: the Initial Calibration Verification (ICV) and Continuing Calibration Verification (CCV). The ICV is run after calibration and before samples to confirm the calibration worked. The CCV is run periodically during the batch to confirm the calibration remains valid as drift, clogging, cone buildup, washout, or other issues occur. This episode concludes with reviewing how to troubleshoot ICV or...

Live, last hour: 6,035 songs on 2,036 stations in 114 countries

Discover the world through radio

More ways to discover (9)

Heard something good? Save it, or open it straight away in Spotify.

★ Artist of the week The fastest riser on the radio this week
Your song here? From € 9 per week →
Radio KometaContinue listening