Notas del episodio
How do you lose $25 million on one job? By building exactly to the construction spec while a second engineering spec, signed off by your own leadership, sat unread until the systems were turned on. If you run design-build work, sit between an engineering department and an estimating department, or have ever assumed someone upstream read the owner's performance criteria, this is the failure that nobody catches on a walkthrough.
In this episode, Adam Cooper walks through the job with Greg Gorman and Jeff Robertson, answers the comments it drew, including whether submittals should have caught…
Web: share.transistor.fm

