Notatki do odcinka
Send us Fan Mail In this episode, we tackle a famous ARE 5.0 Construction & Evaluation (CE) practice question that also connects to PjM and PDD. The scenario? A high-profile client (yes, Cardi B!) who cares most about schedule and design quality — with no concern about cost. Which fee structure is the right fit: GMP, stipulated sum, cost-plus-fixed-fee, or negotiated sum? Head Coach Shikha breaks down the nuances of: Guaranteed Maximum Price (GMP) – when cost certainty drives the contract...

