Skip to content
Global sound
Factory Field Notes

Factory Field Notes

Ep. 10 | Wireless PLC Access: Stop Dragging a Laptop Up 40-Foot Tanks During Commissioning [Field Guide]

· 36 min · Episode 10

Show notes

Wireless PLC Access during commissioning lets you program and troubleshoot a controller from a laptop without running an Ethernet cable across the plant floor. This video shows the field method and the disciplined alternative.
Most PLCs do not connect wirelessly out of the box, so field teams reach for an inexpensive travel router to close the gap. Subscribe for more field grounded guidance on OT networking, commissioning, and industrial modernization from Joltek.
Learn more at Joltek:
- OT Networking Fundamentals: https://www.joltek.com/education/ot-networking-fundamentals
- IT and OT…

Website: share.transistor.fm

Live, last hour: 8,142 songs on 4,416 stations in 124 countries

Discover the world through radio

More ways to discover (7)

Heard something good? Save it, or open it straight away in Spotify.

★ Artist of the week The fastest riser on the radio this week
Your song here? From € 9 per week →
Bayside Radio Colwyn BayContinue listening