Notas do episódio
Not every successful project looks good while it’s happening.
In this episode, I tell the story of a large gantry-based X-ray inspection system that started in frustration and ended in success. The original design never really existed, the space was brutally constrained, and normal installation methods were off the table from day one.
I talk through why we started from scratch, how a distributed motion system unlocked the design, and how we ultimately assembled the machine using modular construction, furniture dollies, ratchet straps, and a willingness to accept that there were no perfect…
Site: podcasters.spotify.com

