IRHUB Nuclear Capital Podcast
autor: KMKT
Nejnovější epizoda
CME's Physical Uranium Contract and Fuel Cycle Pressures
CME's Physical Uranium Contract and Fuel Cycle Pressures
O tomto podcastu
Zach Martin covers the nuclear renaissance powering the AI economy: uprates, offtakes, restarts, and the capital that turns announced megawatts into grid power. An IRHUB Capital series on KMKT.
Epizody
Nejnovějších 20 z 54 epizod
- CME's Physical Uranium Contract and Fuel Cycle Pressures · 5 minBloomberg reported on November 11, 2026 that CME Group is moving ahead with a physically backed uranium futures contract, with storage at the Metropolis Works conversion facility…
- Securing Nuclear Fuel: Oklo and Centrus Partner on Domestic HALEU · 5 minOn November 12, 2026, Oklo and Centrus signed definitive multi-year HALEU purchase agreements, formalizing a June letter of intent. Zach and Emily look at deliveries from…
- X-energy's NRC Milestone: Advanced Nuclear Meets Industrial Demand · 5 minThe NRC has granted a construction permit for Dow and X-energy's Xe-100 project at Seadrift, Texas, and Fluor has the engineering contract for the Cascade facility in Washington…
- Announced vs. Signed: How Much AI Nuclear Power Is Real? · 8 minHow much of the AI nuclear wave is signed, and how much is still a press release? Zach and Emily compare announced and signed agreements across Google, Amazon, Meta…
- Signed vs Announced: How Real Is the AI Nuclear Offtake Boom? · 5 minAbout 10.8 GW of nuclear power is under signed contracts with AI and data-center buyers, while more than 40 GW sits in non-binding announcements. Zach and Emily sort the firm…
- The Existing Fleet: Nuclear Power's Near-Term Capital Story · 8 minUprates, life extensions and restarts at existing U.S. plants can reach AI data centers sooner than new builds. Zach and Emily look at Google's 890 MW Constellation agreement…
- Restarting America's Nuclear Fleet for AI Power · 9 minThree shuttered U.S. plants, Crane Clean Energy Center, Palisades and Duane Arnold, are on track to come back for data-center demand. Zach and Emily cover the timelines, federal…
- Fueling the AI Nuclear Build: HALEU, TRISO, and the Enrichment Race · 11 minFuel may set the pace for advanced reactors. Zach and Emily cover TRISO-X's Oak Ridge construction milestone, X-energy's HALEU agreements, Kairos Power's automated pebble…
- Nuclear Uprates and the Hyperscaler Rush for Power · 6 minGoogle's 20-year Constellation deal funds about 890 megawatts of uprates across 11 units, Amazon's Calvert Cliffs agreement adds a planned 190-megawatt uprate, and DOE's UPRISE…
- The Uprate Rush: How Big Tech Is Buying the Existing Nuclear Fleet · 6 minEarly November 2026: ~10.8 GW signed nuclear for AI versus ~40 GW in non-binding memos—~3.8× more announced than signed. Zach and Emily put Constellation, Vistra, Google, Meta…
- Constellation Energy and the Big Tech Nuclear Boom · 5 minConstellation (CEG) is the bellwether for signed bankable nuclear megawatts—Google's ~890 MW / ~$4.3B uprate PPA, Microsoft's Crane restart (~837 MW / ~$1.6B), and Amazon fleet…
- Hyperscaler Nuclear: What Actually Arrives Before 2028? · 5 minAmazon, Google, Meta, and Microsoft hold about 14.1 GW of nuclear under contract or development—yet only ~44% is from reactors already running, and the sole 2027 new capacity on…
- The Uprate Rush: Existing Reactors Powering AI Right Now · 5 minSigned uprates and conditional DOE money—not renaissance speeches—set the price of AI power this fall. Zach and Emily walk Google/Amazon/Meta Constellation deals and the…
- Announced vs. Signed Nuclear Capacity for AI · 4 minAs of early November 2026, ~10.8 GW of nuclear sits under signed AI/data-center contracts versus ~40.4 GW in non-binding MOUs—about 3.8 to 1 announced-to-signed. Zach and Emily…
- The Great Nuclear Uprate Rush · 5 minWithin about a month: Amazon (Sept 30), Google (Oct 6), and a DOE loan commitment (Oct 27) all point at extra megawatts from running reactors. Zach and Emily track signed PPAs…
- The Great Uprate Rush: Big Tech and Existing Nuclear Fleet Capacity · 5 minNearly a gigawatt of firm power from reactors that already exist—Google–Constellation's October 6 PPA (~890 MW / ~$4.3B) plus Amazon and Meta offtakes funding Constellation life…
- Nuclear Uprates: Powering AI Demand Through the Existing Fleet · 6 minConstellation's September 30 Amazon deal (~690 MW / ~$3B class) and October 6 Google uprate PPA (~890 MW / ~$4.3B) show where fall 2026 checks actually go. Zach and Emily add…
- Nuclear Uprates and Restarts: Powering the Near-Term AI Boom · 5 minMicrosoft's 20-year PPA to restart Crane (ex–Three Mile Island Unit 1)—~837 MW, ~$1.6B, targeted ~2028—anchors near-term firm power beside Google/Amazon/Meta uprates. Zach and…
- The $80 Billion AP1000 Bet: Scaling Nuclear for the AI Era · 5 minAn announced ~$80 billion U.S. partnership frame with Westinghouse, Cameco, and Brookfield aims to deploy AP1000s at gigawatt scale for the AI era. Zach and Emily unpack…
- Meta’s Nuclear Offtake Blitz: 6.6 GW for AI Data Centers · 7 minMeta Platforms' deals with Vistra, Oklo, and TerraPower target up to 6.6 GW by 2035 for PJM data centers—mix of fleet uprates and advanced development. Zach and Emily stress…