Note dell’episodio
As Lovell prepared for the thruster adjustments, Haise finished closing down the LEM and drifted through the tunnel back toward the command module and Swigert threw the switch to stir all 4 cryogenic tanks.
Homepage with Pictures
Sito web: spacerockethistory.podbean.com

