Catatan episode
Austin’s Project Connect is getting dragged in the headlines as “off the rails” and “one of the most expensive light rail projects in the country,” so we slow down and fact-check the story with the full timeline. We walk through what Austin voters actually approved in 2020 under Proposition A, why that plan was always based on early design assumptions, and what the new Austin Light Rail Phase One does and does not include. If you’ve been wondering how a 27-mile vision became a roughly 9.8-mil...

