Notas do episódio
Your hydrogen model makes money for ten years. In year eleven, support ends—and the margin disappears. Did the project ever pencil, or did policy hide the loss?
This episode turns the United States, Canada, the European Union, California, and China into one project-screening decision: advance, redesign or relocate, wait, or stop.
The analysis keeps unlike instruments separate before normalising them:
• U.S. 45V is a lifecycle-carbon-intensity production credit with a before-2028 construction clock. The 2026 maximum is conditional, not the base case.
• U.S. 45Q stays in dollars per tonne…
Site: podcasters.spotify.com

