Built Different
by Spring Street Management Group
Episode 122: Minnesota's First Modular Holiday Inn Express Opens
About this podcast
Built Different is a daily podcast for developers, general contractors, and capital partners working in modular, volumetric, and off-site construction.
No hype. No futurism. Just execution reality.
Each episode breaks down what actually determines success or failure in factory-built projects: coordination gaps, design freeze timing, transportation risks, sequencing failures, financing mismatches, and the hidden costs no one models.
This isn't a show about the promise of modular. It's about what happens when modules hit the jobsite—and what you need to get right before they do.
Topics include:
Why modular projects fail (and it's not the factory)
Design freeze and its hidden costs
Transportation as construction risk
Site work that still controls the timeline
Where modular actually saves money—and where it doesn't
Sequencing, coordination, and the gaps between systems
3-4 minutes daily. Built for people who build.
Brought to you by Spring Street Management Group.
Episodes
The newest 20 of 121 episodes
- Episode 122: Minnesota's First Modular Holiday Inn Express Opens · 3 min · Season 1 Episode 122RISE Modular has completed the Holiday Inn Express & Suites in Alexandria, Minnesota — the state's first modular Holiday Inn Express and the company's fourth modular hotel…
- Episode 121: Amazon's Mass Timber Logistics Prototype in Elkhart · 4 min · Season 1 Episode 121Amazon's D115 Net Zero Delivery Station in Elkhart, Indiana just earned ENR's 2026 Midwest Best Project award for Sustainability — and it's more than a trophy. The…
- Episode 120: Voters Reject Data Centers Across 10 States · 4 min · Season 1 Episode 120Last Tuesday's election sent an unmistakable message to data center developers and the local governments that have been greenlighting their projects: the public is done absorbing…
- Episode 119: ATCO Expands Modular Manufacturing in Ontario · 4 min · Season 1 Episode 119ATCO Structures has officially opened its expanded modular manufacturing facility in Grimsby, Ontario, marking a significant fixed-asset commitment to Canada's modular…
- Episode 118: By-Right Permitting: Modular's Entitlement Unlock · 5 min · Season 1 Episode 118Modular construction has largely solved the manufacturing problem — factory-built is faster and more cost-predictable than stick-built. But modular multifamily projects continue…
- Episode 117: U of Maine's 3D Bio-Home Factory Goes Large · 5 min · Season 1 Episode 117The University of Maine's Advanced Structures and Composites Center is nearing completion on a nearly $82 million, 50,000-sq-ft mass timber facility in Orono — the most…
- Episode 116: An NFL Facility Built in Under 3 Months, Modular · 4 min · Season 1 Episode 116WillScot's Senior Director of Fleet Operations, Sven Louis, broke down how the company delivered a fully operational NFL facility in under three months using modular construction…
- Episode 115: UC Riverside's $299.6M Prefab Housing Win · 5 min · Season 1 Episode 115The UC Riverside North District Phase 2 student housing project — a $299.6 million, 1,568-bed development delivered by McCarthy Building Companies — earned an ENR 2026 West Best…
- Episode 114: Holtec's $2.1M Whistleblower Verdict and SMR Stakes · 4 min · Season 1 Episode 114A New Jersey jury awarded former Holtec International CFO Kevin O'Rourke $2.1 million on October 21 after finding the nuclear developer retaliated against him for refusing to…
- Episode 113: Prefab Interiors and the Schedule Compression Play · 5 min · Season 1 Episode 113Interior construction is consistently the slowest, most change-sensitive phase of a building project — and the conventional recovery tools are running out of runway. With 45% of…
- Episode 112: Meta's $6.6B Research Credit Fight · 5 min · Season 1 Episode 112Congress is pressing Meta over $6.6 billion in federal research tax credits claimed from 2023 through 2025, questioning whether expenses tied to constructing and operating AI…
- Episode 111: Icon's $200M Series D and the Titan Machine · 4 min · Season 1 Episode 111Icon, the Austin-based large-scale 3D printing construction company, closed a $200M Series D co-led by Baillie Gifford and BlackRock. The raise funds production of Icon's new…
- Episode 110: DPR's $230M Prefab Kaiser Permanente Build in Colorado · 4 min · Season 1 Episode 110DPR Construction broke ground on a $230 million Kaiser Permanente medical office facility in Westminster, Colorado — and the build is running prefabrication across structural…
- Episode 109: HUD Bets on Factory-Built Multifamily · 4 min · Season 1 Episode 109HUD has tapped the National Institute of Building Sciences (NIBS) and modular advisory firm MOD X to run a yearlong initiative addressing the persistent barriers blocking…
- Episode 108: HUD's 7-Step Plan to Modernize Manufactured Housing Code · 5 min · Season 1 Episode 108HUD released its "Next Generation Manufactured Housing Action Plan" this week — a seven-step roadmap for rewriting the manufactured housing code to comply with the 21st Century…
- Episode 107: Skanska's First Mass Timber Lab at Cold Spring Harbor · 5 min · Season 1 Episode 107Skanska is wrapping up the $28 million Artificial Intelligence and Quantitative Biology building at Cold Spring Harbor Laboratory in Laurel Hollow, N.Y. — the firm's first mass…
- Episode 106: TVA's First US Small Modular Reactor Permit · 5 min · Season 1 Episode 106The Nuclear Regulatory Commission issued TVA a construction permit on September 29 for a 300-MW GE Vernova Hitachi BWRX-300 small modular reactor at the Clinch River site near…
- Episode 104: Construction's Cybersecurity Blind Spot · 5 min · Season 1 Episode 104Turner Construction, Kiewit, and AECOM all reported unauthorized system access since July 2026 — and the Turner breach allegedly touched ITAR-protected military documents. For…
- Episode 103: Mass Timber Cuts $2M From Western Washington U Build · 4 min · Season 1 Episode 103Mortenson's published case study on Kaiser Borsari Hall at Western Washington University offers one of the more detailed cost-and-schedule breakdowns to come out of a mass timber…
- Episode 102: NJ Fines Data Center $1M Over 123 MW of Unpermitted Power · 5 min · Season 1 Episode 102New Jersey environmental regulators fined DataOne $1.07 million for operating 62 natural-gas generators — nearly 123 MW of unpermitted capacity — at its Vineland AI data center…







